A recent NCAT Appeal Panel decision highlights two critical questions for strata building claims: when did the relevant breach of statutory warranty become apparent, and does the defect satisfy the legal definition of a "major defect"?
In Raysons Constructions Pty Ltd v The Owners – Strata Plan No 87003 [2026] NSWCATAP 324, decided on 20 October 2026, the Appeal Panel allowed the builder's appeal and remitted the proceedings to the Tribunal for determination.¹ The decision reinforces that obtaining an expert report near the end of a warranty period does not, by itself, establish an entitlement to additional time to commence proceedings.
Key takeaways
- NSW statutory warranties run 6 years for major defects and 2 years for other defects, from completion of the work.²
- The extra six months only applies if the breach became apparent in the last six months of the warranty period, and the party relying on it must prove that.¹ ²
- A later expert report does not reset the deadline, and a defect in waterproofing or a slab is not automatically a "major defect".¹
The dispute
The proceedings concerned a 59-lot residential strata building at Meadowbank, constructed in 2013–2014. The alleged defects included cracking in concrete slabs, water ingress and drainage problems.¹
The owners corporation commenced proceedings in November 2020, after the ordinary six-year warranty period had expired. It sought to rely on the additional six-month period available where a breach of warranty becomes apparent within the final six months of the warranty period.¹
Following an earlier appeal and Supreme Court proceedings, the matter returned to the Appeal Panel. The latest decision addressed the application of that extension and the adequacy of the Tribunal's findings about major defects.¹
When is the additional six months available?
Under section 18E of the Home Building Act 1989 (NSW), the warranty period is six years for a breach resulting in a major defect and two years in other cases. The period starts on completion of the relevant work.²
If the breach becomes apparent within the final six months of that period, proceedings may be commenced within a further six months after the warranty period ends.² This is not an automatic extension for every claim, nor is it simply six months from the date an expert report is received.
A breach becomes apparent when any person entitled to the benefit of the warranty first becomes aware, or ought reasonably to have become aware, of it.² The test therefore considers both actual awareness and what ought reasonably to have been known.
A visible defect is not necessarily an apparent breach of warranty
A central distinction is between a physical problem in a building and a breach of the statutory warranties governing its design or construction.
A crack, leak or water stain is a physical defect or deficiency. A breach of statutory warranty involves a conclusion about how the building work was performed, such as whether it was carried out with due care and skill or complied with applicable legal requirements. Awareness of the physical problem does not automatically establish awareness of the relevant breach.¹
However, that distinction does not mean an owners corporation can postpone the deadline merely by waiting for an expert report. The Tribunal must examine what was known, what ought reasonably to have been known, and when, in relation to each particular breach relied upon.¹
Equally, earlier knowledge of one breach does not automatically defeat every other claim concerning the building. The inquiry must address the particular breaches and deficiencies being pursued.¹
The owners corporation must prove its entitlement to the extension
The Appeal Panel found that the Tribunal had wrongly approached the extension on the basis that the builder bore the onus of proving it did not apply.¹
The onus rests on the party seeking to rely on the additional six-month period to establish the facts entitling it to do so. That requires more than identifying the date of a later expert report: the relevant persons, their actual or constructive knowledge, and the timing of that knowledge must be addressed for the particular breaches in issue.¹
For owners corporations, this makes the contemporaneous record important. Complaint emails, meeting minutes, inspection reports, correspondence with the builder and records of earlier repairs should be assessed together, not treated as isolated documents.
A defect in waterproofing or a slab is not automatically a "major defect"
The six-year period also requires proof that the breach resulted in a major defect.²
Under the definition considered by the Appeal Panel, it is not enough that a defect affects a major element, such as a load-bearing component or waterproofing. The defect must also be attributable to a specified cause and cause, or be likely to cause, one of the prescribed consequences: inability to inhabit or use the building or part of it for its intended purpose, destruction, or a threat of collapse.¹ ²
The assessment is not confined to consequences that have already occurred. Evidence about likely future consequences can establish the statutory test; imminent collapse or presently uninhabitable premises are not required.¹
The distinction remains important: establishing defective work is not the same as establishing a major defect. Both issues require proper attention.
What did the Appeal Panel decide?
The builder succeeded in its appeal, but the Appeal Panel did not finally dismiss the owners corporation's proceedings as out of time. Instead, it remitted the matter for determination under the correct legal principles.¹
The Panel also preserved an important distinction concerning the car park slabs: the builder had not established appealable error in the finding that their construction breached statutory warranties through non-compliance with the applicable standard and Building Code requirements. Whether the relevant defects satisfied the major-defect test, and whether the extension was available, remained separate questions.¹
The owners corporation was ordered to pay the builder's appeal costs, subject to the opportunity specified in the orders to seek a variation.¹
Practical implications for owners corporations and builders
The decision underscores the need to address warranty deadlines and evidence early.
- Confirm the completion date. The statutory rules governing completion must be applied, including the specific rules for new strata buildings.
- Analyse each alleged breach separately. A general history of building complaints does not resolve when every breach became apparent.
- Do not assume a later report resets the deadline. Earlier actual or constructive awareness must still be examined.
- Support major-defect allegations with evidence of consequences. Identifying defective waterproofing or structural work is only part of the statutory inquiry.
- Keep a clear documentary history. The dates, content and recipients of complaints, reports and repair communications may be central to the knowledge inquiry.
For builders, the decision also cautions against assuming that an early complaint about a physical defect necessarily proves earlier awareness of the particular breach later sued upon.
Frequently asked questions
How long do you have to claim for building defects in NSW? Under the Home Building Act, six years from completion for a breach resulting in a major defect, and two years for other breaches. A further six months may be available in limited circumstances.²
What is a major defect under the Home Building Act? A defect in a major element, such as a load-bearing component or waterproofing, that is attributable to a specified cause and causes, or is likely to cause, inability to use the building for its intended purpose, destruction or a threat of collapse.¹ ²
When does the extra six months apply? Only where the breach of warranty first became apparent, or ought reasonably to have, within the last six months of the warranty period. Proceedings must then start within six months after the period ends.²
Does an expert report reset the warranty deadline? No. The Tribunal looks at what was known, or ought reasonably to have been known, about each breach and when. A late report alone does not establish the extension.¹
Who has to prove the extension applies? The party relying on it. In Raysons, the Appeal Panel found the Tribunal had wrongly put the onus on the builder.¹
Finn Roache Lawyers assists owners corporations, property owners, builders and developers with building disputes and statutory warranty claims. If a warranty deadline may be close, our construction team can help you assess where you stand. Book a free call
This article provides general information and is not legal advice.